THE STATE AND SUSTAINABLE DEVELOPMENT PROSPECTS OF THE ELECTRIC POWER SYSTEM IN UZBEKISTAN
DOI:
https://doi.org/10.5281/zenodo.21279011Keywords:
electric power system, generation, thermal power plants, combined cycle gas turbines, renewable energy, solar power, wind power, transmission networks, sustainable development.Abstract
The article analyzes recent institutional reforms in Uzbekistan’s electric power sector, the current
state of power generation and transmission infrastructure, and strategic directions for the development of
renewable energy sources. The dynamics of electricity generation volumes and installed capacities of thermal
power plants are examined, along with the results of introducing combined cycle gas turbine (CCGT) units and
the development maps of solar and wind energy up to 2030, in order to assess the level of diversification of
the national energy portfolio. The analysis shows that it is necessary to modernize grid infrastructure, reduce
technological losses, and widely implement digital technologies to enhance system efficiency and ensure
sustainable development.
References
1. Ministry of Energy of the Republic of Uzbekistan. Open data and official reports on the electric power
system of Uzbekistan. Tashkent, various years.
2. Uzbekistan National Power Grid JSC. Data on backbone transmission lines and substation infrastructure.
Company materials. Tashkent, 2024–2025.
3. Statistics Agency of the Republic of Uzbekistan. Dynamics of electricity generation and consumption in
Uzbekistan (2010–2025). Official statistical compilations and data from stat.uz.
4. Thermal Power Plants JSC. Annual reports on capacities and generation indicators of major thermal power
plants. Tashkent, 2019–2025.
5. Uzbekistan: Second Combined Cycle Gas Turbine launched at Talimarjan Thermal Power Plant. UzDaily
international news portal, 2017 (information on the Talimarjan CCGT project).
6. Navoi Combined Cycle Power Plant II, Uzbekistan. PowerTechnology international energy database, 2019
(data on the Navoi CCGT2 project).
7. Mitsubishi Power. Press release on the CCGT3 project with JAC turbine for Uzbekistan’s power system.
2024.
8. JICA. Torakurgan Combined Cycle Power Plant Project, Uzbekistan. Technical report and project materials.
2020.
9. Tashkent Combined Cycle Power Plant, Uzbekistan. PowerTechnology database, 2017.
10. Enerdata. Analytical information on the ACWA Power Syrdarya CCGT power plant project. 2023.
11. Ministry of Energy and PowerTechnology data: analytical information on installed capacities and fuel
structure of major thermal power plants in Uzbekistan. Tashkent, 2024–2025.
12. Uzbekistan National Power Grid JSC. Information and project maps on the development of solar energy
up to 2030. Company materials. Tashkent, 2024.
13. Uzbekistan National Power Grid JSC. Information and project maps on the development of wind energy up
to 2030. Company materials. Tashkent, 2024
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 GREEN ECONOMY AND DEVELOPMENT

This work is licensed under a Creative Commons Attribution 4.0 International License.